Williams Natural Gas Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/1997, Docket: RP97- 67-002, Status: Effective
Fifth Revised Sheet No. 228 Fifth Revised Sheet No. 228 : Superseded
Superseding: Fourth Revised Sheet No. 228
GENERAL TERMS AND CONDITIONS
9. SCHEDULING, CURTAILMENT AND IMBALANCES (Cont'd)
Third, firm Shippers using secondary delivery points not
located on the same line segment as the primary delivery point
under such Shipper's service agreement up to the MDTQ of the
service agreement,
Fourth, ITS and AOS Shippers based on rate paid, from highest
to lowest. ITS and AOS Shippers, whose gas is already flowing
at a discounted rate, may state, in advance, that they are
willing to pay the maximum rate to retain service in the event
WNG receives a higher bid.
(c) If WNG does not have sufficient capacity in any portion of its
system to schedule all firm quantities nominated, Shipper
provided rankings will be used when making reductions, as
noted in Section 9.1(d) above.
(d) Quantities will not be scheduled at receipt points or delivery
points unless confirmed by the Delivering Party or Receiving
Party controlling the facilities.
9.4 Periods of Daily Balancing
A period of daily balancing occurs when confirmed nominations and
anticipated no-notice service deliveries are expected to exceed
anticipated receipts plus WNG's firm storage withdrawal
obligations. During such periods of daily balancing, actual
receipts and deliveries of gas will be allocated to no-notice
transportation and storage agreements on a daily basis rather than
on a monthly basis. WNG will post on its EBB a "Notice of
Implementation of Daily Balancing Procedures" by 5 p.m., for such
daily balancing procedures to be effective the second gas day after
issuance, or such shorter periods as may be necessary to protect
the integrity of WNG's system. Time of posting on the EBB shall be
considered the official time of notification. Such period of daily
balancing will be applicable to all rate schedules and will, to the
maximum extent possible, be imposed only on those portions of WNG's
system where service integrity is threatened. PDAs and OBAs will
remain in effect during periods of daily balancing. Such notice
will remain on WNG's EBB throughout such period of daily balancing.
The period of daily balancing will be lifted when confirmed
nominations and anticipated no-notice service deliveries are not
expected to exceed anticipated receipts plus storage withdrawal
capability on WNG's pipeline system.