Carnegie Interstate Pipeline Company

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 01/01/1995, Docket: CP93-552-003, Status: Effective

Original Sheet No. 78 Original Sheet No. 78 : Effective

Superseding: Original Sheet No. 78

GENERAL TERMS AND CONDITIONS

(Continued)

 

10.3 (Continued)

 

(9) the term of the release;

 

(10) the identity of the

Designated Replacement Shipper, if

applicable;

 

(11) the duration of time the

Releasing Shipper desires the release to be

posted ("bid period"); provided however,

such bid period shall not be less than the

time periods specified in Section 10.6(b);

 

(12) the criteria to be used to

determine the "Best Offer"; provided

however, the Releasing Shipper shall

specify the method by which ties will be

broken; provided further, if the Releasing

Shipper fails to specify such criteria,

CIPCO's criteria set forth in Section

10.3(c) shall apply;

 

(13) any minimum conditions

concerning the rate, term, or volume the

Releasing Shipper is willing to accept,

including whether the Releasing Shipper is

willing to accept a volumetric rate;

 

(14) whether the Releasing

Shipper desires CIPCO to actively market

the released capacity; provided however,

the Releasing Shipper agrees to execute a

separate marketing service agreement with

CIPCO and to pay the charges specified

therein; and

 

(15) the date and time the Notice

Of Intent To Release Capacity is to be

posted on the electronic bulletin board.

 

A Releasing Shipper may release

capacity on the basis of volumetric bids;

provided however, the Releasing Shipper shall

include in the Notice Of Intent To Release

Capacity the maximum rate for volumetric

releases, determined by dividing the applicable

Reservation Charge, as set forth on the

currently effective Sheet No. 7 of this FERC Gas