Carnegie Interstate Pipeline Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1997, Docket: RP97-173-001, Status: Effective
First Revised Sheet No. 52 First Revised Sheet No. 52 : Effective
Superseding: Original Sheet No. 52
GENERAL TERMS AND CONDITIONS
(Continued)
5.2 Determination of Quantity and Quality of Gas
Delivered by Displacement
Notwithstanding the provisions of Sections 3.2,
5.1, and 6, the quantity and quality of gas delivered
by CIPCO to Customer by displacement through
interconnecting pipelines shall be determined on the
basis of quantities nominated to be delivered by
displacement to the transporting pipeline.
5.3 Measurement Cut Off Date
The cutoff for closing of measurement is 5
business days after the business month. A meter
adjustment becomes a prior period adjustment after
the fifth business day of the month. Measurement
prior period adjustments shall be reported with the
restated line item with new total quantity for the
date and month. Missing or late measurement data
shall be estimated, with actual data treated as a
prior period adjustment with the measuring party
providing the estimate.
6. MEASUREMENT EQUIPMENT
6.1 Measurement Equipment
CIPCO shall install, operate, and maintain, at
CIPCO's own expense, at or near the Delivery
Point(s), measurement equipment which shall consist
of the necessary metering devices, designed and
installed in accordance with the current published
recommendations of the American Gas Association or as
mutually agreed upon by Customer and CIPCO provided
that:
(a) Where orifice measurement equipment is
to be used, it shall utilize "Flange Tap
Connections" and the static pressure shall be
measured at the down-stream flange tap
connection.
(b) A recording thermometer or other
mutually acceptable device shall be installed at
the measuring station to continuously measure
the flowing gas temperature.