Enbridge Pipelines (AlaTenn) Inc.
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/01/2003, Docket: RP00-401-001, Status: Effective
First Revised Sheet No. 126 First Revised Sheet No. 126 : Effective
Superseding: Original Sheet No. 126
GENERAL TERMS AND CONDITIONS (continued)
corrected pursuant to the procedures in effect at the time
the imbalance was incurred.
(f) Limitation on Penalties - Any imbalances caused by an event
which excuses performance under Section II of the General
Terms and Conditions or caused by an action of Transporter,
including providing the Shipper inaccurate imbalance
information at points with Electronic Data, (1) will not be
included in the calculation of the total monthly imbalance
for purposes of determining the appropriate cash-out level
and (2) will be cashed-out at the 0-5% tolerance level in
Section 3.7.
(g) Disposition of Penalty Revenue and Cash-Out Provisions - All
Penalty Revenue received by Transporter in accordance with
Section 22.2(f) and all Cash-out Provision revenues received
by Transporter in accordance with Section 3.7 (c) that are
in excess of Transporter's costs, including, but not limited
to: (1) payments made by Transporter in accordance with
Section 3.7, and (2) Transporter's gas costs and fuel and
loss costs properly allocable to Shipper(s), will be
refunded annually to all Shippers pro-rata based on the
ratio of such Shipper's through-put for the most recent
twelve (12) months to the total through-put of all Shippers
during the same period. If Transporter incurs a net cost
during such 12 month period, the amount will be deferred to
offset against penalty revenue during the next 12 month
period. Carrying costs shall be calculated on the net
balance each month utilizing the rate set forth in Section
154.501 of the Commission's Regulations.
(h) Operational Integrity - Transporter shall have the right to
take any action that may be required to adjust receipts and
deliveries under any transportation agreement to reflect
actual experience or to alleviate conditions which threaten
the operational integrity of Transporter's system, including
without limitation maintenance of service to Shippers with a
higher scheduling priority and/or services.