Enbridge Pipelines (AlaTenn) Inc.
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/2002, Docket: RP02-485-000, Status: Effective
First Revised Sheet No. 109 First Revised Sheet No. 109 : Effective
Superseding: Original Sheet No. 109
GENERAL TERMS AND CONDITIONS (continued)
(2) PDA duration - PDA's shall remain in effect until a
replacement PDA is received from the point operator,
or designee; provided, however, PDA's shall be updated
at the beginning of each month. The PDA may need to
be updated as the nominations at the point change.
3.4 Scheduling and Allocation
Each nomination under this section shall be considered an
original nomination and shall be replaced to be changed.
When a Shipper includes a date range as part of its
nomination, each day within that range is considered an
original nomination. When a subsequent nomination is
received for one or more days within that range, the
previous nomination shall be superseded by the subsequent
nomination only to the extent of the days specified. The
days of the previous nomination outside the range of the
subsequent nomination are unaffected. Nominations have a
prospective effect only. Subsequent nominated quantities
shall represent replacement daily quantities. All
nomination procedures that apply to regular nominations
(excluding timelines), including quick response, confirming
with upstream and downstream parties and scheduling, shall
also apply to hourly nominations. The sending party shall
adhere to nomination, confirmation and scheduling deadlines.
It is the party receiving the request who has the right to
waive the deadlines.
(1) Transporter shall support the following standard
nomination cycles:
(i) The Timely Nomination Cycle: 11:30 a.m.
for nominations leaving control of the
nominating party; 11:45 a.m. for receipt
of nominations by Transporter (including
from Title Transfer Tracking Service
Providers (TTSPs)); noon to send Quick
Response; 3:30 p.m. for receipt of
completed confirmations by Transporter
from upstream and downstream connected
parties; 4:30 p.m. for receipt of
scheduled quantities by Shipper and point
operator (central clock time on the day
prior to flow).