Enbridge Pipelines (AlaTenn) Inc.
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/2001, Docket: GT01- 31-000, Status: Effective
Original Sheet No. 4 Original Sheet No. 4 : Effective
SUMMARY OF RATES AND CHARGES
Fuel
Base Transp. Rate After And Loss
Rate Tariff Surchg. Cost Rate Other Current Retention
Schedule Rate Rate Adjustment Adjustment Adj. Percentage
FT
Winter1
R1-Demand $3.9105 --- --- --- $3.9105 ---
Commodity
Maximum 0.20¢ --- --- 0.22¢ 0.42¢ 0.8%
Minimum 0.20¢ --- --- 0.22¢ 0.42¢ 0.8%
Summer2
R1-Demand $2.9557 --- --- --- $2.9557 ---
Commodity
Maximum --- --- --- 0.22¢ 0.22¢ 0.8%
Minimum --- --- --- 0.22¢ 0.22¢ 0.8%
FT-SG
Winter
Commodity
Maximum 28.78¢ --- --- 0.22¢ 29.00¢ 0.8%
Minimum 0.20¢ --- --- 0.22¢ 0.42¢ 0.8%
Summer
Commodity
Maximum 21.61¢ --- --- 0.22¢ 21.83¢ 0.8%
Minimum --- --- --- 0.22¢ 0.22¢ 0.8%
IT
Winter
Maximum 13.06¢ --- --- 0.22¢ 13.28¢ 0.8%
Minimum 0.20¢ --- --- 0.22¢ 0.42¢ 0.8%
Summer
Maximum 9.72¢ --- --- 0.22¢ 9.94¢ 0.8%
Minimum --- --- --- 0.22¢ 0.22¢ 0.8%
1 Maximum Volumetric Rate for Firm Service (winter): 13.28¢
2 Maximum Volumetric Rate for Firm Service (summer): 9.94¢