Midcoast Interstate Transmission, Inc.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/1997, Docket: GT97- 71-000, Status: Effective
Third Revised Sheet No. 88 Third Revised Sheet No. 88 : Effective
Superseding: SECOND REVISED SHEET NO. 88
GENERAL TERMS AND CONDITIONS (continued)
3.8 Shipper's Request to Release Rate Schedule FT Capacity
Rights
A "Releasing Shipper," including any Replacement Shipper
that desires to make a subsequent release as provided in
Section 3.15 herein, is a Shipper that desires to release
for a minimum of one (1) day, its rights in whole or in part
to firm transportation service at any receipt or delivery
point on Transporter's system (provided that any release
downstream of the replacement shipper's primary delivery
point will have a lower scheduling priority to all firm
shippers using that point as a Primary Point(s))pursuant to
Rate Schedule FT, and unless otherwise exempt herein, who
shall post to Transporter's EBB prior to the applicable
deadlines prescribed in Section 3.14, a Release Request
containing the following information:
(a) Releasing Shipper's name and Transportation Service
Contract Number;
(b) the maximum daily quantity ("MDQ") expressed as Dth/day
to be released (including any minimum acceptable MDQ);
(c) the proposed commencement date and term of the release
(including any minimum acceptable term);
(d) the Primary Receipt Points and Primary Delivery Points
for the released service and the amount of the firm
capacity to be released at each such point (the total
Receipt Point capacity released, excluding applicable
fuel and losses shall be equal to the total Delivery
Point capacity released);