Midcoast Interstate Transmission, Inc.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/1997, Docket: GT97- 71-000, Status: Effective
First Revised Sheet No. 40 First Revised Sheet No. 40 : Effective
Superseding: ORIGINAL SHEET NO. 40
RATE SCHEDULE FT-SG (continued)
Transporter may authorize, accept deliveries of gas at its
Delivery Point(s) shipped pursuant to the IT Contract for
redelivery to the qualified end-user.
7.3 Qualified end-users on whose behalf an FT-SG Shipper
receives gas must have an alternate fuel supply or an
alternate method of operations to satisfy total
requirements for a minimum of five consecutive days,
subject to verification by Transporter, during periods of
curtailment.
7.4 Previously approved service pursuant to this Section 7 may
be terminated, on 60 days written notice to the FT-SG
Shipper, if the qualified end-user ceases to meet the
requirements of this Section 7.
7.5 Transporter shall not be obligated to permit deliveries
pursuant to this Section 7 if the qualified end-user is
also using firm gas supplied from the Shipper's FT-SG
Contract or if the qualified end-user's facilities are
installed in any manner to allow the substitution of FT-SG
service for IT service at any time. The qualified end-
user's equipment will be subject to inspection at
reasonable intervals by Transporter. In the event that any
such prohibitive substitutions have occurred or could
occur, Transporter may terminate its approval of service
under this Section 7 on ten (10) days written notice to the
FT-SG Shipper. Such termination is without prejudice to
any other remedies Transporter may have.
7.6 An FT-SG Shipper receiving interruptible transportation
deliveries pursuant to this Section 7, shall install,
maintain, and operate, at its own expense, at or near the
FT-SG Shipper's Point of Delivery to the qualified end-
user, a measuring station properly equipped with meters and
other measuring equipment satisfactory to Transporter, by
which the daily volume of gas delivered by the FT-SG
Shipper to each of the qualified end-users receiving
service under the provisions of this Section 7 can be
accurately determined. The quantity of gas to be billed
under the IT Contract pursuant to which the qualified end-