RATE SCHEDULE FT-SG (continued)

 

 

be at a mutually agreeable interconnection between

Transporter's facilities and the facilities of the

upstream pipeline system providing service as shown in

Exhibit A to the FT-SG Contract. The total quantity

specified at the Primary Receipt Point(s) must equal the

sum of the Contract Demand and Fuel and Losses requirement

set forth in Section 8 of this Rate Schedule. Transporter

shall not be required under any circumstances to receive

gas at any Receipt Point(s) where the total quantity of gas

scheduled for receipt on any day is less than that required

for the accurate measurement of quantities to be received.

 

4.2 Delivery Points: The Primary Delivery Point(s) for all gas

transported by Transporter under this Rate Schedule shall

be at a mutually agreeable interconnection between

Transporter's facilities and the facilities of Shipper or

Shipper's designee as shown in Exhibit B to the FT-SG

Contract. The total quantity specified at the Primary

Delivery Point(s) must equal the Contract Demand stated in

the FT-SG Contract. Transporter shall not be required under

any circumstances to deliver gas at any Delivery Point

where the total quantity of gas scheduled for delivery in

any day is less than that required for the accurate

measurement of quantities to be delivered.

 

4.3 Change in Receipt and Delivery Point(s): Subject to

availability of Firm Capacity, Shipper may change the

Primary Receipt or Delivery Point(s) under its FT-SG

Contract (including redistributing the Contract Demand

amount) on a monthly basis by an amendment of Exhibits A

and/or B to the FT-SG Contract. Such amendment shall be

reflected in an executed revision of Exhibits A and/or B

submitted to Transporter by the twentieth of the month

preceding the month for which the change is desired.

 

Subject to available capacity, Transporter will allow a

change to designated Receipt Point(s) at any time in the

event of failure to deliver committed gas supplies because

of equipment failure, compressor malfunction, freezing, or

similar force majeure conditions. Transporter will

provide, via its Electronic Bulletin Board ("EBB") notice