Reliant Energy Gas Transmission Company
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/31/1996, Docket: RP97-193-000, Status: Effective
First Revised Sheet No. 262 First Revised Sheet No. 262 : Effective
Superseding: Original Sheet No. 262
GENERAL TERMS AND CONDITIONS
(continued)
the design throughput used to calculate the
then-current CSC Charge or, if no such
actual throughput exists, the level of
volumes underlying the calculation of the
Challenger's Percentage, multiplied by (B)
the number of years then remaining in the
Recovery Period. Such an adjustment will
continue to be made during the Recovery
Period until the total jurisdictional
volumes actually transported on behalf of
or sold to the Challenger equals the design
throughput used in the calculation of the
adjustment. The maximum CSC Charge
calculated in this manner will apply only
to the Challenger.
18.10 Interest.
Except as provided otherwise in
Section 18.9.3(a), the interest rate applicable
hereunder shall be redetermined on the first Day
of each calendar quarter and shall be equal to
the lower of (i) the rate then in effect
pursuant to 18 C.F.R. 154.501, or (ii) five
percent (5%) per annum.
18.11 Effectiveness.
The terms and conditions of this Section 18
shall remain in full force and effect until
July 1, 2002, and shall not be modified,
superseded or otherwise affected by any general
or other rate change filing or restatement of
rates made by Transporter under section 4 of the
Natural Gas Act, or upon any general or other
change in rates ordered by the Commission
pursuant to section 5 of the Natural Gas Act.