Reliant Energy Gas Transmission Company
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/2002, Docket: RP03- 60-000, Status: Effective
Second Revised Sheet No. 310 Second Revised Sheet No. 310 : Effective
Superseding: First Revised Sheet No. 310
GENERAL TERMS AND CONDITIONS
(continued)
5.5 Delivery Nominations and Scheduling (continued)
(2) the next highest priority will be afforded to
Shippers which have designated such point as a
Secondary Delivery Point. In the event
sufficient capacity does not exist to schedule
all nominations submitted qualifying for this
priority category, capacity will be allocated
first, to Shippers for whom the Secondary
Delivery Point is within its Primary Path (as
provided for in Section 30 of these General
Terms and Conditions) and then, on a pro rata
basis based on each Shipper's nomination.