Reliant Energy Gas Transmission Company
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/2002, Docket: RP03- 60-000, Status: Effective
Second Revised Sheet No. 282 Second Revised Sheet No. 282 : Effective
Superseding: First Revised Sheet No. 282
GENERAL TERMS AND CONDITIONS
(continued)
5.2 Receipt Nominations and Allocation Methodology (continued)
5:30 p.m. Transporter sends Quick Response.
8:00 p.m. Receipt of completed confirmations
by Transporter from upstream and
downstream connected parties.
9:00 p.m. Transporter provides scheduled
quantities to Shipper and Operator.
The effective time of scheduled quantities
resulting from a nomination submitted during the
Intraday 2 Nomination Cycle pursuant to this
Section 5.2(a)(i)(4) will be 9:00 p.m. on the
Day of Gas flow. Bumping shall not occur due
to nominations submitted during the Intraday 2
Nomination Cycle pursuant to this Section
5.2(a)(i)(4).
(ii) Flexible Nominations: In addition to the standard
nomination cycles described in Section 5.2(a)(i)
above, a Shipper may submit an electronic receipt
nomination at any time, to be effective at the top of
any Hour; provided that it is received by Transporter
at least sixty (60) minutes prior to the time Shipper
desires gas to flow pursuant to such nomination.
Transporter will attempt to confirm and schedule
nominations and to make notice available to Shipper
of scheduled quantities prior to Shipper's requested
flow time; provided, however, if a Shipper of lower
scheduling priority must be bumped in order to
schedule Shipper's nomination, Shipper's nomination
will not take effect until Transporter has provided
the bumped Shipper at least sixty (60) minutes'
notice of bumping.