Reliant Energy Gas Transmission Company
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2002, Docket: RP00-482-003, Status: Effective
Third Revised Sheet No. 246 Third Revised Sheet No. 246 : Effective
Superseding: Second Revised Sheet No. 246
GENERAL TERMS AND CONDITIONS
(continued)
Internet Web Site. See Section 22.
Interruptible Maximum Daily Injection Quantity. See
Section 6 of Rate Schedule ISS.
Interruptible Maximum Daily Withdrawal Quantity. See Section 6 of
Rate Schedule ISS.
Interruptible Maximum Storage Quantity. See Section 6 of Rate
Schedule ISS.
Interruptible Working Gas Quantity. See Section 6 of Rate
Schedule ISS.
Intraday 1 Nomination Cycle. See Sections 5.2(a)(i)(3) and
5.5(a)(i)(3).
Intraday 2 Nomination Cycle. See Sections 5.2(a)(i)(4) and
5.5(a)(i)(4).
Intraday Nomination shall mean a prospective nomination submitted
after the deadline for the Timely Nomination Cycle. An Intraday
Nomination must end at the end of the Day for which the
nomination is submitted.