Reliant Energy Gas Transmission Company
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/2002, Docket: RP03- 60-000, Status: Effective
Second Revised Sheet No. 216 Second Revised Sheet No. 216 : Effective
Superseding: First Revised Sheet No. 216
RATE SCHEDULE PHS
PERRYVILLE HUB SERVICE
(continued)
2. APPLICABILITY AND CHARACTER OF SERVICE (continued)
(b) park and loan service shall have a lower priority than all
services, including those under Rate Schedule IT, other than
service under Rate Schedule SBS, which shall have an equal
priority, and except that the priority for the return of
loaned Gas when required by Transporter shall be subordinate
only to service under Rate Schedules NNTS, FT, RSS
(withdrawals) and HFT at primary points.
If Transporter cannot satisfy all requests for park and loan
services, or continue such services already scheduled, under
this Rate Schedule and Rate Schedule SBS, Transporter shall
assign capacity, schedule and/or curtail services hereunder
using the same priorities and methods as are provided for
other interruptible service in Sections 5 and 10 of the
General Terms and Conditions.
2.10 Shipper's Service Agreement under this Rate Schedule PHS shall
designate the Maximum Aggregate Quantity ("MAQ") to be parked
and/or loaned at any one time under the transaction, and any other
quantity limitations applicable to the transaction, e.g., daily,
monthly. Each borrowing and parking transaction shall be
accounted for and tracked separately, even if occurring
contemporaneously. Shipper's nomination for parking and loaning
activities must designate the applicable point(s), quantities
applicable thereto, and Service Agreements, if applicable. When
Shipper schedules removal of Gas in its parked account, if
nominated to be transported or received into Pools on
Transporter's system, Transporter may deem all such quantities as
having been received at the point(s) at which the parked Gas
entered Transporter's system and Shipper shall also specify the
applicable points(s) at which the prior parking occurred. When
Shipper desires to eliminate an Imbalance consisting of
Oversupplies under a Service Agreement, if Transporter accepts and
schedules any such nomination under this Rate Schedule, then such
Gas may be deemed parked at the point(s) at which it initially
entered Transporter's system.