Reliant Energy Gas Transmission Company
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2001, Docket: RP96-200-068, Status: Effective
Third Revised Sheet No. 8J Third Revised Sheet No. 8J : Superseded
Superseding: Second Revised Sheet No. 8J
STATEMENT OF NEGOTIATED RATES
Contract Rate Contract
Shipper Name Number Schedule Demand Receipt Point(s) Delivery Point(s) Rate
-------------------- --------- --------- -------- ------------------- ----------------- --------------
Entergy Power, Inc. 2824 FT 13,000 Neutral Pooling Area CGT @ Perryville See Formula below
Trunkline @ Richland
SONAT @ Perryville
TET @ West Monroe
TGT @ Perryville
Gulf South @ West Monroe
ANR @ Perryville
Tennessee 100
Tennessee 800
Formula Rates for Services between specified points up to Contract Demand:
The formula rate will be based on the following index prices as reflected for spot gas delivered to the pipelines at the points indicated, as represented
by the price published in the first of the month issue of Inside FERC's Gas Market Report for the service month ("Index Price"). If the information or
publication ceases to be published, the parties shall select another mutually agreeable Index Price. The assumed 100% load factor unit rate to be charged
shall be equal to $0.05/Dth plus 75% of the difference between (a) the amount remaining when the Index Price specified in (2) below is subtracted from the
Index Price specified in (1) below, less (b) the Compressor Fuel Value calculated as described below, pluss $0.05 / Dth.
(1) Columbia Gulf Louisiana
(2) REGT East
The Compressor Fuel Value shall be calculated by adding (i) the product of the applicable Compressor Fuel percentage as specified and in effect from time
to time in REGT's Tariff times the Index Price set forth in (2) above, plus (ii) the EPC tracker.
In any event, however, the assumed 100% load factor unit rate shall never be below $0.05.
Rate may default to maximum if Transporter is unable to collect Negotiated Rates for any reason during the term of the contract, and Shipper has termination
right in such event. Unless Transporter otherwise agrees, the Commodity Rate shall be the applicable minimum, and the rate for any authorized overrun
quantities shall be the greater of the applicable maximum Tariff rate or the applicable formula unit rate. Rate includes any applicable GRI, ACA, GT&C
Section 13.4, Order No. 528 and Order No. 636 transition costs surcharges.
Standard Rate and Related Provisions for Non-Maximum Rate Agreements, posted in the REGT News section of REGT's Internet web site "pipelines.reliantenergy.com,"
shall apply to this transaction