Northwest Pipeline Corporation
First Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/03/1991, Docket: RP91-166-006, Status: Effective
First Revised Sheet No. 319 First Revised Sheet No. 319 : Effective
Superseding: Original Sheet No. 319
RATE SCHEDULE TF-1
Firm Transportation
(Continued)
13. RESERVATION CHARGE ADJUSTMENTS
13.3 The adjustments provided in this Section 13 shall not apply if
Transporter's failure to deliver the peak day or annual volume
requested was due to Shipper's failure to deliver such gas to
Transporter or to Shipper's inability to accept delivery of such gas.
14. OVERRUN PROVISIONS
14.1 Authorized Demand-2 Overruns. During any Nomination Year
ending June 30, the total quantity of gas transported for Shipper by
Transporter under this Rate Schedule TF-1 in excess of Shipper's
Annual Demand-2 Nomination but less than Transportation Contract
Demand times 365, shall constitute authorized D-2 overrun volume.
14.2 Unauthorized Demand-2 Overruns. During any Nomination Year
ending June 30, the total quantity of gas transported for Shipper by
Transporter under this Rate Schedule TF-1 in excess of Shipper's
Transportation Contract Demand times 365 shall constitute
unauthorized D-2 overrun volume.
14.3 D-2 overrun penalty payments. The penalty payment for
authorized D-2 overrun volumes as defined in Section 14.1 above shall
be in addition to the commodity rate otherwise payable and shall be
equal to the 100% load factor rate under Transporter's Rate Schedule
TF-1 and shall be computed as the sum of (a) and (b) below:
(a) The Demand-1 rate divided by 30.4;
(b) The Demand-2 rate;
The rates to be utilized shall be the currently effective
tariff rates set forth on Sheet No. 201 of this First Revised Volume
No. 1-A tariff.
The penalty payment for unauthorized D-2 overun volumes as
defined in Section 14.2 above shall be in addition to rates otherwise
payable and shall be equal to $5 times such unauthorized D-2 overrun
volume.
14.4 Authorized Demand-2 Overrun Provisions for Certain Rate
Schedule TF-1 Customers. The authorized Demand-2 Overrun provisions
contained in this Section 14 shall apply to WP Natural Gas, Sierra
Pacific Power Company, Southwest Gas Corporation-Northern California
and Southwest Gas Corporation-Northern Nevada as provided in a joint
offer of settlement filed on November 6, 1991 and approved by the
Federal Energy Regulatory Commission in its December 26, 1991 order
in Docket Nos. RP91-166-003, et al.