East Tennessee Natural Gas Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1997, Docket: RP97- 58-003, Status: Effective
Original Sheet No. 300 Original Sheet No. 300 : Superseded
APPENDIX (Page 4)
ELECTRONIC DATA INTERCHANGE TRADING PARTNER AGREEMENT
DATE________________________
TO BE EFFECTIVE____________________(DATE)
[Applies across all transaction set types]
2. STANDARDS: 18 C.F.R. 284.10, as approved by FERC, and as changed by FERC, from time
to time, and Tennessee Gas Pipeline Companies EDI implementation guides, as those may
be changed from time to time.
3. INDUSTRY GUIDELINES: ANSI ASC X12
4. FILE ENCYRPTION PROCEDURES FOR INTERNET ELECTRONIC DELIVERY MECHANISMS (EDM):
a) Contact for public key exchange (emergency and scheduled):
____________________________________________________________________________________
b) Method of contact and related information such as phone number and/or e-mail
address:
____________________________________________________________________________________
c) Chosen method of key exchange (examples: public encryption keys must be communicated
in electronic form):
____________________________________________________________________________________
d) Scheduled public key exchange procedures (if any; also, please include frequency):
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
e) Emergency public key exchange procedures:
____________________________________________________________________________________
f) Verification procedures to confirm appropriate exchange of public keys:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
5. TERMS AND CONDITIONS: It is agreed that both parties will conduct a mutual EDI test of
the transmission of data by utilizing test documents and a test site ("Test") before
implementing transmission of actual processing in the production environment
("Production"). Test of Trading Partners EDI transfers should include data that should
be as reflective of the data which will actually be sent by the Trading Partner in the
Production. No actual production of documents will be transmitted until notification of
the Trading Partner by Pipeline that successful testing has been achieved under
Pipeline's requirements.
6. DATA RETENTION: (If no special data retention procedures have been agreed upon, enter
"None".)
_______________________________________________________________________________________