East Tennessee Natural Gas Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2000, Docket: RP00-245-000, Status: Effective
Second Revised Sheet No. 149 Second Revised Sheet No. 149 : Superseded
Superseding: First Revised Sheet No. 149
GENERAL TERMS AND CONDITIONS (Continued)
(k) any other conditions of the release including (i) whether
Releasing Shipper will require Replacement Shipper to
execute a contract with respect to the release, in which
case a copy of the contract shall be provided by Releasing
Shipper to Transporter upon request; or (ii) date when
Releasing Shipper would like bidded release posted for
bidding.
18.3 Replacement Shipper's Request for Assignment
A Shipper that desires to acquire rights to LNGS service shall
submit to Transporter a Replacement Shipper Request which shall
contain the following information:
(a) Replacement Shipper's name;
(b) the Maximum Daily LNGS Quantity and Winter Season LNGS
Quantity desired;
(c) the desired commencement date and term of the storage
service;
(d) the maximum rate(s) that Replacement Shipper will pay for
the storage service.
18.4 Posting of Release and Replacement Requests
(a) Releasing Shipper shall post all applicable information
required by Section 18.2 hereof, on PASSKEY, which shall
automatically assign an individual release number to the
Release Request. The period of time for Transporter's
posting of the information ("Posting Period"), and the
period of time during which bids will be received on such
Release Request ("Bidding Period"), shall be as set forth in
Section 18.6.
(b) A Shipper may withdraw its Release Request up to the close
of the applicable Bidding Period where unanticipated
circumstances justify and no minimum bid has been submitted.
(c) Replacement Shipper shall post all applicable information
required by Section 18.3 on PASSKEY. Such requests shall
remain posted for a period of four weeks or until a
transaction is effected, whichever is shorter.