East Tennessee Natural Gas Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2000, Docket: RP00-245-000, Status: Effective
Fifth Revised Sheet No. 111 Fifth Revised Sheet No. 111 : Superseded
Superseding: Fourth Revised Sheet No. 111
GENERAL TERMS AND CONDITIONS (Continued)
4.5 Correction of metering errors - failure of meters: In the event a meter is out of
service or registering inaccurately, the volume of gas delivered shall be
determined:
(a) by using the registration of any check meter or meters, if installed and
accurately registering; or, in the absence of (a);
(b) by correcting the error if the percentage of error is ascertainable by
calibration, tests, or mathematical calculation; or, in the absence of both
(a) and (b), then;
(c) by estimating the quantity of delivery by deliveries during periods under
similar conditions when the meter was registering accurately.
4.6 Correction of metering errors - adjustments: A measurement data correction shall
become a prior period adjustment (PPA) after the fifth (5th) business day following
the production month. Measurement data corrections should be processed within six
(6) months from the production month, unless (i) Transporter, Shipper and Balancing
Party mutually agree otherwise or (ii) the correction is the result of a deliberate
omission or misrepresentation by a Party or a mutual mistake of fact. In all
instances where a correction is made, Shipper, Transporter or Balancing Party, as
applicable, has 90 days to dispute the correction. In the case of corrections made
under (i) or (ii) above, the period for resolving corrections will be tolled until
the correction is settled.
4.7 Preservation of metering records: Transporter and Shipper shall each preserve for
a period of at least one year all test data, charts and other similar records.
5. QUALIFICATION FOR SERVICE
5.1 All Shippers/Balancing Parties requesting firm transportation service,
interruptible transportation service, LNG storage service, supply aggregation
service, or load management service to commence on or after the implementation of
restructured services on Transporter's system pursuant to Docket No. RS92-33-000,
must provide, via PASSKEY or by facsimile, if necessary, the information required
by this Section 5 and on Transporter's Service Request Form included in this FERC
Gas Tariff, in order to qualify for service. No request for service will be
processed or entered on Transporter's log or scheduled for receipt and delivery
until the required information has been provided. If Transporter determines that
Shipper's request is incomplete or deficient, Transporter shall so notify Shipper.
Shipper may supplement the request within 10 working days after such notice.
Specific requests for information concerning service(s) should be directed to:
East Tennessee Natural Gas Company
Contract Administration
P.O. Box 1642
Houston, Texas 77251-1642
(713) 627-4781
Telecopy: (713) 627-5041