Panhandle Eastern Pipe Line Company

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 01/25/1996, Docket: RP95-397-003, Status: Effective

Substitute First Revised Sheet No. 321O Substitute First Revised Sheet No. 321O : Superseded

Superseding: Sub Original Sheet No. 321O

GENERAL TERMS AND CONDITIONS (Continued)

 

 

 

Ten percent (10%) of Panhandle's ST Costs,

including Levelized Interest, shall be recovered

by means of the ST Volumetric Surcharge

applicable to service under Rate Schedules IT and

EIT. The ST Volumetric Surcharge shall be stated

on effective Tariff Sheet Nos. 7 and 8 of

Panhandle's FERC Gas Tariff, First Revised Volume

No. 1 and shall become a part of the stated rates

for service provided under such Rate Schedules.

 

On or before June 1 of each year during the

Section 18.13 Recovery Period, Panhandle will

file with the Commission such updates as

otherwise are required by this Section 18.13 to

the ST Reservation Surcharge applicable to

service under Rate Schedules FT, EFT, SCT and LFT

and the ST Volumetric Surcharge applicable to

service under Rate Schedules IT and EIT with such

updated Surcharges to be effective on the

immediately following July 1. Panhandle will

provide 30 days notice of such changes to the ST

Reservation and ST Volumetric Surcharge.

 

The provisions of this Section 18.13 shall be

fully applicable to successor, replacement and

new rate schedules.

 

(e) Filing Procedures for Stranded Transportation

Costs

 

The ST Reservation Surcharge during the Section

18.13 Recovery Period shall be designed to

recover ninety percent (90%) of the ST Costs over

three (3) years using the applicable firm service

design determinants underlying Panhandle's then

effective rates for service under Rate Schedules

FT, EFT, SCT and LFT.

 

The ST Volumetric Surcharge during the Section

18.13 Recovery Period shall be designed to

recover ten percent (10%) of the ST Costs over

three (3) years using the applicable

interruptible service design determinants

underlying Panhandle's then effective rates for

service under Rate Schedules IT and EIT.