Panhandle Eastern Pipe Line Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/10/2000, Docket: RP00-162-000, Status: Effective
Fourth Revised Sheet No. 311 Fourth Revised Sheet No. 311 : Superseded
Superseding: Third Revised Sheet No. 311
GENERAL TERMS AND CONDITIONS
(Continued)
(c) Mechanisms for Recovery of GSR Costs
Ninety (90) percent of Panhandle's GSR Costs,
including carrying charges, shall be recovered by
means of a GSR Reservation Surcharge applicable to
service under Rate Schedules FT, EFT, SCT, LFT
and HFT. The GSR Reservation Surcharge applicable to
service under Rate Schedule SCT shall be converted to
a Volumetric Surcharge at a 52.5% load factor rate.
The GSR Reservation Surcharge shall be stated on
effective Tariff Sheet Nos. 4, 5, 6, 15 and 17 of
Panhandle's FERC Gas Tariff First Revised Volume No.
1, as the same may change from time to time, and
shall become a part of the stated rates for services
provided under such Rate Schedules.
Ten (10) percent of Panhandle's GSR Costs, including
carrying charges, shall be recovered through the
rates applicable to interruptible service under Rate
Schedules IT and EIT as the same may change from time
to time, and shall become part of the stated rates
for services provided under such Rate Schedules.
Carrying Charges shall be calculated in accordance
with Section 154.501(d) of the Commission's
Regulations.
The provisions of this Section 18.7 shall be fully
applicable to successor, replacement and new rate
schedules.
(d) Filing Procedure For Initial GSR Cost Collection
Period
(1)Panhandle may make one or more rate filings to
recover GSR Costs from Shippers served under
Rate Schedules FT, EFT, SCT, IT, EIT, LFT
and HFT. An Initial GSR Cost Collection Period
shall apply to each rate filing Panhandle makes
to recover GSR Costs.