Panhandle Eastern Pipe Line Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/10/2000, Docket: RP00-162-000, Status: Effective
Original Sheet No. 112 Original Sheet No. 112 : Superseded
RATE SCHEDULE HFT (Continued)
HOURLY FIRM TRANSPORTATION SERVICE
In addition to the otherwise applicable charges set
forth for monthly service on the effective Tariff
Sheet No. 17 for November through March, a Shipper
electing CRPþ will be allowed to pay up to 80% of the
Reservation Charges due for the period April through
October in the preceding November through March
period. CRPþ elections which specify the portion of
the April through October Reservation Charges to be
paid during the preceding November through March
period will be due by October 1 of each year to be
effective November 1. Revised CRPþ elections will be
allowed up to the fifteenth Business Day preceding
the Month of Gas flow, for prospective application
only, so long as the Shipper's total annual
obligations for Reservation Charges during the 12
month CRPþ Period are not affected by such revisions
and provided that such revisions do not result in the
Reservation Charge for any month during the April
through October period exceeding the charge which
would have been applicable had the CRPþ election not
been made.
(c) Maximum CRPþ reservation rates for each Shipper shall
be reflected on effective Tariff Sheet No. 26.
(d) The usage rates set forth on effective Tariff Sheet
No. 17 shall not be affected by the provisions of
this Section 3.10.
3.11 Negotiated Rates
Shipper and Panhandle may agree, on a prospective basis,
to a Negotiated Rate with respect to the charges
identified in Sections 3.1, 3.2 and 3.3 herein which may
be less than, equal to or greater than the Maximum Rate;
shall not be less than the Minimum Rate; may be based on a
rate design other than straight fixed variable; and may
include a minimum quantity. Such Negotiated Rate shall be
set forth on Exhibit C of the executed Service Agreement
and on the currently effective Tariff Sheet No. 27. The
Maximum Rate shall be available to any Shipper that does
not choose a Negotiated Rate.
Shippers paying a Negotiated Rate which exceeds the
Maximum Rate will be considered to be paying the Maximum
Rate for purposes of scheduling, curtailment and
interruption, and calculating the economic value of a
request for unsubscribed firm capacity. In addition,
a Shipper that does not agree to pay any surcharges
will not be granted a scheduling preference that deems
such surcharges have been paid. Replacement Shippers may
not bid or pay a rate greater than the Maximum Rate and
are not eligible for Negotiated Rates.