Panhandle Eastern Pipe Line Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/25/1996, Docket: RP95-397-003, Status: Effective
Substitute Original Sheet No. 95 Substitute Original Sheet No. 95 : Superseded
RATE SCHEDULE LFT (Continued)
LIMITED FIRM TRANSPORTATION SERVICE
3. RATES
The rates and charges for service under this Rate Schedule LFT
shall be as follows:
3.1 Transmission Charge
If Shipper designates a Point(s) of Receipt or a Point(s)
of Delivery on the transmission portion of Panhandle's
system, Shipper shall pay a Monthly Transmission Charge
which consists of a reservation component and a commodity
component.
(a) The reservation component of the Transmission Charge
shall be the product of the MDCQ times the applicable
Transmission reservation rates per Dt. as set forth
on the effective Tariff Sheet No. 15. The
reservation component shall be pro-rated for the
first and last contract Months to adjust for the
number of Days during those Months service was
available.
(b) The commodity component of the Transmission Charge
shall be the product of the actual Quantity of Gas
delivered during the Month times the applicable
Transmission commodity rates per Dt. as set forth on
the effective Tariff Sheet No. 15.
(c) If both the Point(s) of Receipt and the Point(s) of
Delivery are located within the Field Zone, the
applicable rates shall be as set forth on the
effective Tariff Sheet No. 15 for service within the
Field Zone only; if both the Point(s) of Receipt and
Point(s) of Delivery are located within the Market
Zone, the applicable rates shall be as set forth on
the effective Tariff Sheet No. 15 for service within
the Market Zone only; if the Point(s) of Receipt and
the Point(s) of Delivery are located in different
zones, the applicable rates shall be derived by
adding the effective rates for service in the Field
Zone and the Market Zone.