Panhandle Eastern Pipe Line Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/1993, Docket: RS92- 22-009, Status: Effective
Substitute Original Sheet No. 69 Substitute Original Sheet No. 69 : Superseded
RATE SCHEDULE WS (Continued)
WINTER STORAGE SERVICE
Percentage of Stored Volume
to the
Maximum Stored Quantity Available Withdrawal Quantities
100% - 30% 100% of MDWQ
<30% - 10% 75% of MDWQ
<10% - 0% 60% of MDWQ
The available Stored Volume shall be increased, up to the
Maximum Stored Quantity, by the Quantity of Gas Shipper transfers
into WS Storage in accordance with Section 14.2 of the General Terms
and Conditions. The available Stored Volume shall be reduced by the
Quantity of Gas Shipper transfers out of WS Storage in accordance
with Section 14.2 of the General Terms and Conditions.
In no event shall Panhandle be obligated to provide any Storage
service for which capacity is not available or which would require
the construction or acquisition of new facilities or the modification
or expansion of existing facilities.
3. RATES
The rates and charges for Storage service under this Rate
Schedule from Panhandle's Market Area Storage Facilities and Field
Area Storage Facilities shall be as follows:
3.1 Capacity Charge
Shipper shall pay a Monthly Capacity Charge which shall be
the product of 1/12th the Maximum Stored Quantity times
the applicable capacity charge per Dt. as set forth on the
effective Tariff Sheet No. 11.
3.2 Deliverability Charge
Shipper shall pay a Monthly Deliverability Charge which
shall be the product of the Maximum Daily Withdrawal
Quantity times the applicable deliverability charge per
Dt. as set forth on the effective Tariff Sheet No. 11.
3.3 Injection Charge
Shipper shall pay an Injection Charge which shall be the
product of the Quantity of Gas actually received from