Panhandle Eastern Pipe Line Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/1993, Docket: RS92- 22-005, Status: Effective
Original Sheet No. 61 Original Sheet No. 61 : Superseded
RATE SCHEDULE IOS
IN/OUT STORAGE SERVICE
1.AVAILABILITY
This Rate Schedule is available for Natural Gas Storage service
performed by Panhandle Eastern Pipe Line Company (hereinafter called
Panhandle) for any party (hereinafter called Shipper) which has
executed a Service Agreement in the form prescribed under this Tariff
for service under this Rate Schedule.
2.APPLICABILITY AND CHARACTER OF SERVICE
This Rate Schedule shall apply to Gas made available by Shipper
to Panhandle under firm, interruptible or third party transportation
agreements at the IOS Point and nominated for Storage under this Rate
Schedule, subject to the General Terms and Conditions herein and the
further provisions of the Service Agreement.
The service provided hereunder consists of the injection by
Panhandle of Shipper's Gas into Storage, Storage in Panhandle's Field
Area Storage Facilities and the subsequent withdrawal from Storage of
Shipper's Gas, all on a firm basis. Injections may be made at any
time, subject to daily nomination by Shipper and available Maximum
Stored Quantity. The Maximum Daily Injection Quantity (MDIQ) shall
be 1/200th of the Maximum Stored Quantity. Withdrawals may be made
at any time, subject to daily nomination by Shipper and available
Stored Volume. The Maximum Daily Withdrawal Quantity (MDWQ) shall be
1/100th of the Maximum Stored Quantity.
The available Stored Volume shall be increased, up to the
Maximum Stored Quantity, by the Quantity of Gas Shipper transfers
into IOS Storage in accordance with Section 14.2 of the General Terms
and Conditions. The available Stored Volume shall be reduced by the
Quantity of Gas Shipper transfers out of IOS Storage in accordance
with Section 14.2 of the General Terms and Conditions.
In no event shall Panhandle be obligated to provide any Storage
service for which capacity is not available or which would require
the construction or acquisition of new facilities or the modification
or expansion of existing facilities.