Caledonia Gas And Storage
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/30/2010, Docket: RP10-1032-000, Status: Effective
Original Sheet No. 84 Original Sheet No. 84
provided however that Caledonia will calculate and include such
credits on Non-Offending Customers’ invoices for a period shorter than
twelve (12) Months in the event and to the extent that the total
accumulated amount of OFO penalty revenue collected pursuant to this
Section 6.6(i) by Caledonia as of the end of any Month exceeds
$1,000,000. Caledonia will file with the Commission a penalty
disbursement report within sixty (60) days of August 31 or sixty (60)
days after the end of the Month for which revenue collected exceeds
$1,000,000. Any penalty revenue credited to Non-Offending Customers
pursuant to this Section shall include interest calculated in
accordance with Section 154.501(d) of the Commission’s regulations.
(j) Liability of Caledonia. Caledonia shall not be liable for any
costs incurred by any Customer or point operator in complying with an
OFO. Caledonia shall not be responsible for any damages that result
from any interruption in service that is a result of a Customer’s or
point operator’s failure to comply promptly and fully with an OFO, and
the non-complying Customer or point operator shall indemnify Caledonia
against any claims of responsibility. However, Caledonia shall use
reasonable efforts to minimize any such costs or damages.
(k) Unilateral Action. In the event that (1) Customer(s) or point
operator(s) does not respond to an OFO, or (2) the actions taken
thereunder fail to correct the problem for which the OFO was issued, or
(3) Caledonia cannot carry out the procedures with respect to OFOs
within the time available, Caledonia may take unilateral action,
including the curtailment of Firm service, to maintain the operational
integrity of its Storage Facility. For purposes of this Section, the
operational integrity of Caledonia’s Storage Facility shall encompass
the integrity of the physical facility and the preservation of physical
assets and their performance, the overall operating performance of the
entire physical facility as an entity, and the maintenance (on a
reliable and operationally sound basis) of total Storage Facility
deliverability and the quality of Gas Delivered.
7. INJECTION/WITHDRAWAL AND TRANSPORTATION
7.1 Customer shall tender all Gas for injection into storage to
Caledonia at the Point of Injection/Withdrawal specified in the
relevant Service Agreement. The quantity of Gas tendered by Customer
to Caledonia for injection into storage shall not exceed the MDIQ plus
the applicable Fuel Reimbursement without the consent of Caledonia.
7.2 Availability. Caledonia shall make available all Gas to be
withdrawn from storage to Customer at the Point of Injection/Withdrawal
specified in the relevant Service Agreement. The quantity of Gas made
available to Customer shall not exceed the MDWQ without the consent of
Caledonia.