Caledonia Gas And Storage
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/30/2010, Docket: RP10-1032-000, Status: Effective
Original Sheet No. 81 Original Sheet No. 81
and shall state the reduced quantities of Gas that Caledonia estimates
it will be able to park, loan, store, inject, withdraw, receive or
Deliver, as applicable, and the estimated duration of the interruption.
(d) If interruption is required, Caledonia and Customer shall cooperate
to the maximum extent possible in making adjustments to Receipt,
Deliveries, injections or withdrawals to minimize injury to any
property or facilities.
6.5 Interruption Liability. Caledonia shall not be liable for any loss
or damage to any person or property caused, in whole or in part, by any
interruption of service, except to the extent caused solely by
Caledonia’s negligence or willful misconduct.
6.6 Operational Flow Orders.
(a) Circumstances Warranting Issuance. As specified in this Section
6.6, Caledonia shall have the right to issue Operational Flow Orders
(“OFO”) that require actions by Customers in order (1) to alleviate
conditions that threaten to impair reliable service, (2) to maintain
operations at the pressures required to provide efficient and reliable
services, (3) to have adequate Gas supplies in the System to Deliver on
demand, (4) to maintain service to all Firm Customers and for all Firm
services, and (5) to maintain the System in balance for the foregoing
purposes. Caledonia shall lift any effective OFO promptly upon the
cessation of operating conditions that caused the relevant System
problem.
(b) Actions to be Taken to Avoid Issuance. Caledonia shall, take all
reasonable actions necessary to avoid issuing an OFO. Such actions
shall include, in order of priority (1) working with point operators
to temporarily adjust Receipts and/or Deliveries at the Point of
Injection/Withdrawal, (2) working with Customers and point operators
to adjust scheduled flows on the System, or (3) taking any other
reasonable action designed to mitigate the System problem. After taking
all such reasonable actions to avoid issuing an OFO, Caledonia will
have the right to issue OFOs, if necessary, in the circumstances
described in Section 6.6(a).
(c) Preliminary Notifications/Follow-up Reports. Caledonia shall
provide, via posting on the Internet Web Site and to affected parties
through the affected party’s choice of electronic notice delivery
mechanism(s), notice to all Customers and point operators of upcoming
System events such as anticipated weather patterns and operational
problems that may necessitate the issuance of an OFO.