4.6 For purposes of the measurement of Gas in this Section

4, Transporter may rely on the measuring equipment

installed and operated by a Delivering Pipeline at a

Receipt Point or a Receiving Pipeline at a Delivery

Point; provided, that such Delivering Pipeline or

Receiving Pipeline installs and operates such equipment

in accordance with the standards set forth in this

Section 4. Shipper shall indemnify, save and hold

Transporter, its subsidiaries and/or affiliates and

their directors, officers, employees and agents, free

and harmless from all suits, actions, debts, accounts,

damages, costs, losses and expenses arising from or out

of Transporter's reliance under this Section 4.6.

 

4.7 Check Measuring Equipment. An Interconnect Operator

may install, maintain and operate, at its own expense,

such check measuring equipment as desired; provided,

that such equipment will not be installed on property

containing Transporter's measuring equipment at or near

the Receipt or Delivery Points, and that such equipment

will be installed so as not to interfere with the

operation of the primary measuring equipment.

Transporter and Interconnect Operator, in the presence

of each other, may have access to the other's measuring

equipment at all reasonable times for installing,

reading, cleaning, changing, repairing, inspecting,

testing, calibrating or adjusting done in connection

with the other's measuring equipment. Only the party

owning the equipment may perform these operations,

unless otherwise agreed. The failure of either party

to witness such operations will not affect the validity

of the operations.

 

4.8 Calibration and Test of Meters. Transporter shall

verify the accuracy of its own measuring equipment at

reasonable intervals; provided that Transporter shall

not be required to conduct such verification more

frequently than once in a 90-day period. If either

Transporter or Interconnect Operator notifies the other

that it desires a special test of any measuring

equipment, the operating party shall cooperate to

secure an immediate verification of the accuracy of

such measuring equipment and joint observation of any

adjustments. The payment for all such tests shall be

borne by the party requesting the test, unless

otherwise agreed to by the parties.

 

If Transporter relies on the measuring equipment of a

Delivery Pipeline or a Receiving Pipeline and

Interconnect Operator notifies Transporter that it

desires a special test of such measuring equipment,

Transporter will exercise its rights to verify the

accuracy of the measuring equipment of such Delivery

Pipeline or Receiving Pipeline, subject to Interconnect

Operator reimbursing Transporter for any payments or

expenses associated therewith.

 

4.9 Notice of Equipment Tests. Unless otherwise agreed to

between Transporter and Interconnect Operator, the

party operating the measuring equipment shall give

notice to the other party of the time and location of

all tests of Gas delivered hereunder or of any

equipment used in measuring or determining the nature

or quality of such Gas, in order that such other party

may conveniently have its representative present. Upon

request and thirty (30) Days written notice, each party