Stingray Pipeline Company, L. L. C.
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2008, Docket: RP08-436-000, Status: Effective
Third Revised Sheet No. 305 Third Revised Sheet No. 305
Superseding: Second Revised Sheet No. 305
EXHIBIT B - ___
Dated: _____________________
Company:
Contract No.:________________
Delivery Period(s) Receipt Receipt Delivery Delivery
FROM TO Point(s) Point(s) Point(s) Point(s)
(mm/dd/yyyy)(mm/dd/yyyy)
MDQ MDQ
RECEIPT, PRESSURE, ASSUMED ATMOSPHERIC PRESSURE
-----------------------------------------------
Gas to be delivered to Stingray at the Receipt Point(s) shall be at a
delivery pressure sufficient to enter Stingray's pipeline facilities at
the pressure maintained from time to time, but Shipper shall not deliver
Gas at a pressure in excess of the Maximum Allowable Operating Pressure
(MAOP) stated for each Receipt Point in Stingray's Catalog of Points.
The measuring party shall use or cause to be used an assumed atmospheric
pressure corresponding to the elevation at such Receipt Point(s).
DELIVERY PRESSURE, ASSUMED ATMOSPHERIC PRESSURE
-----------------------------------------------
Gas to be delivered by Stingray to Shipper, or for Shipper's account, at
the Delivery Point(s) shall be at the pressures available in Stingray's
pipeline facilities from time to time. The measuring party shall use or
cause to be used an assumed atmospheric pressure corresponding to the
elevation at such Delivery Point(s).
RATES
-----
Except as otherwise provided below, Shipper shall pay Stingray the
applicable maximum rate(s) and all other lawful charges as specified in
Stingray's applicable rate schedule. In the event the parties agree upon