Stingray Pipeline Company, L. L. C.
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2008, Docket: RP08-436-000, Status: Effective
Fourth Revised Sheet No. 302 Fourth Revised Sheet No. 302
Superseding: Third Revised Sheet No. 302
EXHIBIT B - ___
Dated: _____________________
Company:
Contract No.:
Delivery Point(s):
MDQ
Name / Location PIN No. (Dth)
---------------------------------- ------- ------
FIRM DELIVERY POINT(S):
1. __________________________________ ________ _______
__________________________________ ________ _______
__________________________________ ________ _______
__________________________________ ________ _______
INTERRUPTIBLE DELIVERY POINT(S):
2. __________________________________ ________ _______
__________________________________ ________ _______
__________________________________ ________ _______
__________________________________ ________ _______
Delivery Pressure, Assumed Atmospheric Pressure
-----------------------------------------------
Gas to be delivered by Stingray to Shipper, or for Shipper's account, at
the Delivery Point(s) shall be at the pressures available in Stingray's
pipeline facilities from time to time. The measuring party shall use or
cause to be used an assumed atmospheric pressure corresponding to the
elevation at such Delivery Point(s).
Signed for Identification
Stingray: ________________________________
Shipper: ________________________________
Supersedes Exhibit B - , Dated:_________________