Stingray Pipeline Company, L. L. C.
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2009, Docket: RP08-436-004, Status: Effective
Original Sheet No. 185A Original Sheet No. 185A
GENERAL TERMS AND CONDITIONS
successor or replacement) of the contents found in the
continuous liquids sampler (composite sampler) located
at the platform operator's platform connected to
Stingray, water is identified within the sample taken,
or (2) following the placement and periodic monitoring
of seals on the tap valves located downstream of the
Gas meter, such seals are found to be broken or
disturbed.