Stingray Pipeline Company, L. L. C.
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/1993, Docket: RS92- 81-003, Status: Effective
Original Sheet No. 184 Original Sheet No. 184 : Effective
GENERAL TERMS AND CONDITIONS
----------------------------
21. PRESSURE AND DELIVERY CONDITIONS
21.1 RECEIPT POINT PRESSURE
Shipper shall deliver gas to Stingray at the pressure
prevailing in Stingray's System at the Receipt Point, as such
pressure may vary from time to time.
21.2 DELIVERY POINT PRESSURE
Stingray shall deliver natural gas to Shipper at the
Delivery Point at the pressure available in Stingray's pipeline at
such point.