Stingray Pipeline Company, L. L. C.
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2008, Docket: RP08-436-000, Status: Effective
First Revised Sheet No. 183A First Revised Sheet No. 183A
Superseding: Original Revised Sheet No. 183A
GENERAL TERMS AND CONDITIONS
(d) Either Stingray or Shipper may witness the
installation or maintenance of other's equipment.
Either Stingray or Shipper shall not be required to
verify accuracy more often than once during any thirty
(30) Day period. If, upon test, accuracy is found to
be within 2% by volume (chromatograph/calorimeter
within 0.5%), such equipment shall be assumed to be
accurate. Any error exceeding these percentages will
require correction to zero error of previous
recordings back to the date error began. If beginning
date of error is unknown, correction shall extend to
one-half the time since the last test, not to exceed
sixteen (16) Days. Measurement data corrections
should be processed within six (6) Months of the
production Month with a three (3) Month rebuttal
period. This standard shall not apply in the case of
deliberate omission or misrepresentation or mutual
mistake of fact. Parties' other statutory or
contractual rights shall not otherwise be diminished
by this standard.