Stingray Pipeline Company, L. L. C.

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 11/01/2008, Docket: RP08-436-000, Status: Effective

Fifth Revised Sheet No. 156 Fifth Revised Sheet No. 156

Superseding: Fourth Revised Sheet No. 156

 

GENERAL TERMS AND CONDITIONS

 

segment shall receive all Interruptible Points

upstream of the break point and the downstream

path segment shall receive all Interruptible

Points downstream of the break point. The

direction of flow for path segments must be the

same direction of flow for the original path.

The Replacement Shipper may nominate service at

Receipt and Delivery Points for the path segment

that results in a reverse flow from the original

path; however, a physical forward haul will be

treated as being outside of the path if the

original path is physically a backhaul, as

provided in Section 3.5 of these General Terms

and Conditions. The upstream and downstream

path segments shall each have the pooling point,

except that a pooling point which is an

Interruptible Point under Stingray's Tariff and

which is identified as the break point for the

path segment release shall become the sole

Delivery Point for the upstream capacity and the

sole Receipt Point for the downstream capacity.

 

(2) The commodity and reservation charges applicable

to deliveries to and from newly created path

endpoints that are the pooling point as a result

of a path segment release shall be determined in

accordance with Section 7 of these General Terms

and Conditions.

 

(3) No Replacement Shipper or Subreplacement Shipper

shall have the right to change the Firm Receipt

or Delivery Points listed in the Eligible Firm

Transportation Agreement, unless the Original

Shipper and Stingray agree to amend the Eligible

Firm Transportation Agreement to accordingly

change the Firm Receipt and Delivery Points.

 

(e) A Capacity Release Request may include the right by a

Releasing Shipper to recall all or part of the

capacity, and/or to reput all or part of the recalled

capacity, at any time and from time to time. All

recalls or reputs must be made in accordance with the

other provisions of Stingray's Tariff, including

Section 16.14 of these General Terms and Conditions.