Stingray Pipeline Company, L. L. C.
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2008, Docket: RP08-436-000, Status: Effective
Second Revised Sheet No. 153 Second Revised Sheet No. 153
Superseding: First Revised Sheet No. 153
GENERAL TERMS AND CONDITIONS
(2) The fixed reservation charge and/or volumetric
charge the Prearranged Shipper has agreed to pay
for the released capacity;
(3) Whether the capacity being released is subject
to recall and/or reput in the Prearranged
Release and, if so, the exact conditions of such
recall and/or reput (which conditions must
conform with Sections 16.5 and 16.14); and
(4) The proposed effective date of the Prearranged
Release and the proposed term of the Prearranged
Release.
(5) The Prearranged Shipper's Released
Transportation Service Contract Number.
(c) Whether the Releasing Shipper will accept Qualified
Bids which are contingent on subsequent events (such
as the purchase of upstream or downstream capacity),
and if so, what events and the last date by which such
contingency must be fulfilled;
(d) Whether the Releasing Shipper will accept Qualified
Bids with longer terms or larger volumes, and if so,
what is the maximum volume and the longest term the
Releasing Shipper will accept;
(e) Whether the Releasing Shipper wants Stingray to
actively market its capacity rights subject to the
Prearranged Release pursuant to Section 17 of these
General Terms and Conditions;
(f) The starting date for and the length of time for the
open season (which must conform to Section 16.7) and
the length of time [consistent with Section 16.9(b)]
for the Prearranged Shipper to be able to match a
winning Qualified Bid;
(g) Whether the Releasing Shipper will accept Qualified
Bids whose revenues will vary by the volume
transported, and if so, any minimum amount to be
billed as a reservation charge even if there is no
flow (or insufficient flow);