Stingray Pipeline Company, L. L. C.

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 11/01/2008, Docket: RP08-436-000, Status: Effective

First Revised Sheet No. 117A First Revised Sheet No. 117A

Superseding: Original Revised Sheet No. 117A

 

GENERAL TERMS AND CONDITIONS

 

throughput, cost of the facilities, operating and

maintenance as well as administrative and general

expenses attributable to the facilities, the

revenues Stingray estimates will be generated as a

result of such construction, and the availability

of capital funds on terms and conditions acceptable

to Stingray. In estimating the revenues to be

generated, Stingray will base those revenues upon

transportation rates it expects to be able to

charge, exclusive of any surcharges such as ACA and

Event Surcharge, and the projected incremental

volumes which will result from the project.

 

(c) Stingray will respond to each request for

installation of Receipt Point facilities within 60

Days after receiving the request. Each request

will be assessed in a manner that is not unduly

discriminatory. If the requested Receipt Point

facilities are operationally feasible (as

hereinafter defined), Stingray will grant the

request to construct the facilities. The Receipt

Point facilities shall be considered operationally

feasible if (1) the construction or operation of

the facilities will not create any significant

operational problems for Stingray, (2) the

facilities will not adversely affect the rendition

of existing firm service to Shippers under any of

Stingray's firm service rate schedules or adversely

alter the operation of Stingray's pipeline system,

and (3) the location of the Receipt Point

facilities is mutually agreeable.

 

4.2 OBLIGATION

 

Stingray's maximum obligation to receive Gas at the

Receipt Point(s) under the Agreement shall never exceed

the lesser of: (a) the applicable MDQ under the

Agreement in the aggregate or at individual points, as

specified in the Agreement or as applicable at such point

under this Tariff; or (b) the total daily volume Shipper

or its designee is able and willing to tender at the

Receipt Point(s).

 

4.3 LOCATION

 

Unless otherwise described in the Agreement, the Receipt

Point(s) for transportation Agreements shall be located

at the interconnection between the facilities of Shipper,

or its designee, and the facilities of Stingray.