Stingray Pipeline Company, L. L. C.
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2008, Docket: RP08-436-000, Status: Effective
Second Revised Sheet No. 117 Second Revised Sheet No. 117
Superseding: First Revised Sheet No. 117
GENERAL TERMS AND CONDITIONS
4. RECEIPT POINTS
4.1 FACILITIES AT RECEIPT POINTS
(a) Unless otherwise agreed by Stingray, Stingray shall
own, operate and maintain all pipeline and
measurement facilities necessary to receive and
measure Gas hereunder. Shipper shall (in addition
to all other applicable charges) reimburse Stingray
for the actual cost (including income taxes
associated with a contribution-in-aid of
construction) of any and all facilities installed
by Stingray pursuant to this Section at Shipper's
request in order to provide service for such
Shipper including, but not limited to, the cost of
all labor, materials and rights-of-way; provided
that Shipper shall repay Stingray in kind for any
Gas lost from Stingray's pipeline as a result of
the installation of such facilities. Stingray may
submit billings to Shipper up to sixty (60) Days in
advance for the estimated cost of construction to
be incurred by Stingray. Shipper shall make
payments within ten (10) Days of the date of
receipt of any billings submitted by Stingray
pursuant to this Section. For purposes of this
Section, the bill is deemed to be received by
Shipper three (3) Days after the postmark date.
Late payments shall be subject to Section 13 of
these General Terms and Conditions. Any such
estimated billings shall be reconciled to the
actual costs of construction, and any payments to
reflect such reconciliation shall be made, within
six (6) Months after construction is completed.
Neither the amounts collected hereunder nor the
cost of such facilities shall be recognized in
establishing Stingray's general System rates.
(b) Stingray may elect, on a nondiscriminatory basis,
to pay all or a portion of the costs of the
facilities constructed pursuant to subsection (a)
above if Stingray determines that the construction
of such facilities is economically beneficial to
Stingray. For purposes of determining whether a
project is beneficial, Stingray will evaluate
projects on the basis of various economic criteria,
which will include the estimated transportation