Stingray Pipeline Company, L. L. C.

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 11/01/2008, Docket: RP08-436-000, Status: Effective

Third Revised Sheet No. 69 Third Revised Sheet No. 69

Superseding: Second Revised Sheet No. 69

 

RATE SCHEDULE FTS-2

FIRM TRANSPORTATION SERVICE

 

judgment, the capacity and operating capability of its

System will permit such receipt, transportation and delivery

without impairing the ability of Stingray to meet its other

obligations. In granting requests for overrun service,

Stingray shall act in a manner consistent with the overrun

service priorities set out in the General Terms and

Conditions of this Tariff. Shipper shall pay Stingray for

each Dth of overrun Gas received for transportation the

maximum applicable rate for Authorized Overrun Service as

determined pursuant to Section 8.2(d) of this Rate Schedule

FTS-2.

 

7.2 Except as provided in the last sentence of this Section

7.2, if, over any consecutive ninety (90) Day period

during which Stingray's pipeline is not fully subscribed

on a firm basis, Shipper ships through Stingray's

Facilities a quantity of Gas in excess of 120% of the sum

of Shipper's applicable MDQs for each Day of the ninety

(90) Day period then Stingray shall have the right to

require Shipper to make an election to increase its

quarterly MDQs for the balance of the Contract Year by:

(a) a quantity equal to the percentage increase in actual

shipments under its FTS-2 Agreement for such ninety (90)

Day period over the sum of Shipper's applicable MDQs for

each Day of the ninety (90) Day period, or (b) a quantity

equal to the difference between the quantity actually

shipped by Shipper under its FTS-2 Agreement during said

ninety (90) Day period and the sum of Shipper's

applicable MDQs for each Day of such ninety (90) Day

period. Shipper shall be required to make its election

upon receipt of Stingray's notice provided in accordance

with Section 25 of the General Terms and Conditions of

this Tariff. Notice of Shipper's election shall be

provided to Stingray in accordance with Section 25 of the

General Terms and Conditions of this Tariff the next Day

following receipt of Stingray's notice and the increase

shall become effective on the first Day of the Contract

Quarter next following Stingray's notice to Shipper. The

increase shall remain in effect for the balance of the

Contract Year. In the event that Shipper fails to make a

timely election following receipt of Stingray's notice,

Shipper shall be deemed to have elected to increase its

MDQs in accordance with the methodology set forth in (a)

above. This Section 7.2 shall not apply during the first

and second Contract Quarters of the first Contract Year

of service under Shipper's FTS-2 Agreement.