Empire Pipeline, Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/25/2009, Docket: RP09-267-000, Status: Effective
First Revised Sheet No. 183 First Revised Sheet No. 183
Superseding: Original Sheet No. 183
GENERAL TERMS AND CONDITIONS
12. CAPACITY RELEASE (Cont'd.)
12.9 Billing Adjustments
Transporter shall credit the bill of the Existing Shipper with
any reservation, demand or capacity charges (including
surcharges thereon), and, in the case of a Negotiated Rate
Shipper responsible for commodity or usage charges, such
commodity or usage charges (including surcharges) billed to a
Replacement Shipper utilizing capacity released by the Existing
Shipper; provided, however, that should a Replacement Shipper
(including a Replacement Shipper of any Secondary Existing
Shipper) default on its obligation to make timely payment for
the charges billed by Transporter, such credit shall be
reversed, as of the date the credit was made, and the Existing
Shipper shall be liable for such charges, together with interest
as set forth in Section 7.2 of these General Terms and
Conditions. The bill of the Existing Shipper shall be credited
with any such charges received by Transporter subsequent to the
reversal of such credit.
The rate paid by a Replacement Shipper in any capacity release
transaction which is not subject to Transporter's maximum rate
pursuant to Section 284.8(b)(2) of the Commission's regulations
will be deemed to be a final rate and is not subject to refund.