2. APPLICABILITY AND CHARACTER OF SERVICE (Cont'd.)
2.12 The Contract MDQ shall be a uniform quantity throughout the
contract year, except that Transporter may, on a not unduly
discriminatory basis, agree to certain differing levels in the
Contract MDQ during specified periods during the year. The
Contract MDQ and any differing levels in the Contract MDQ, shall
be specified in the executed service agreement. For purposes of
Section 15 of the General Terms and Conditions, (a) a service
agreement under this Rate Schedule at the applicable maximum
rates with varying levels of Contract MDQ for a term of twelve or
more consecutive months at a Contract MDQ greater than zero shall
be a Qualifying Agreement, and (b) a "quantitative portion" of
Shipper's Contract MDQ or the portion bid upon must reflect a
uniform percentage reduction for each month of the contract year,
or as mutually agreed to by Transporter on a non-discriminatory
basis.
2.13 Transporter shall not be required to receive or deliver gas at a
receipt or delivery point where the total quantity of gas for
transportation scheduled is less than that required to operate
existing measurement facilities at such point.