Empire Pipeline, Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/10/2008, Docket: CP06-5-010, Status: Effective
Original Sheet No. 12 Original Sheet No. 12
RATE SCHEDULE FT
Firm Transportation Service
(Continued)
1. AVAILABILITY (Cont'd.)
1.5 This Rate Schedule FT is available only for transportation to
Point(s) of Delivery that are equipped with equipment sufficient to
provide Transporter with real time measurement, communication and
control capability. All Point(s) of Receipt must also be equipped
with such equipment. Transporter may waive this requirement on a
non-discriminatory basis with respect to a Point of Delivery or
Point of Receipt if it determines that:
(a) such equipment exists at another point on Transporter's system
and can (i) control gas flows at the Point of Receipt or
Delivery and (ii) provide a close approximation of the quantity
of gas flowing at such Point of Receipt or Delivery; or
(b) another form of measurement, communication and control is
adequate in consideration of the volumetric limitations of the
interconnect facilities.
1.6 In addition to the information specified in Section 2.1 of the
General Terms and Conditions, a request for service under this rate
schedule shall include the following:
(a) Points of Receipt/Delivery: The primary Point(s) of Receipt
and Point(s) of Delivery for the requested transportation
together with the name of the entity delivering the gas to
Transporter and the name of the entity to receive the gas from
Transporter,
(b) Gas Quantities: The maximum daily quantity (MDQ) applicable
to each primary Point of Receipt and Point of Delivery, stated
in dekatherms.