Cameron Interstate Pipeline, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2008, Docket: RP08-647-000, Status: Effective
Original Sheet No. 143 Original Sheet No. 143
GENERAL TERMS AND CONDITIONS
(continued)
time since the date of the last test, but not exceeding
a correction period of sixteen (16) Gas Days where
orifice measurement equipment is used in the computation
of quantity and not exceeding forty-five (45) Gas Days
where other measurement equipment is used; and
(c) Where the quantity of gas for a period cannot be
corrected with accuracy, the quantity of gas shall be
estimated:
(i) By using the registration of any existing and
agreed upon check equipment considered by parties
concerned to be registering accurately, or in the
absence of such facilities,
(ii) By correcting the error, if the quantity or
percentage of error is ascertainable by
calibration, test, or mathematical calculation,
or if neither of the two foregoing procedures are
applicable,
(iii) By relating the quantity of receipt or delivery
to receipts or deliveries during periods under
similar conditions when the measurement equipment
was deemed to have been registering accurately.
16.7 Preservation of Records. Each party shall preserve for a period of
at least two (2) years all test data, charts and other similar
records or such longer period as may be required by any duly
constituted authority having jurisdiction.
16.8 Flow Control. The Pipeline shall control flow of gas into and out
of its facilities at all measurement facilities, but may allow the
following if all of Pipeline's operating standards and requirements
are met: (a) Pipeline may allow third parties to control flow into
the Pipeline's facilities, but reserves the right to override the
third party's flow control equipment, and (b) Pipeline may allow
third parties to control flow out of the Pipeline's facilities, but
reserves the right to override the third party's flow control
equipment.