Cameron Interstate Pipeline, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2008, Docket: RP08-647-000, Status: Effective
Original Sheet No. 140 Original Sheet No. 140
GENERAL TERMS AND CONDITIONS
(continued)
16.2 Measurement Operations and Equipment. Measurement operations shall
include, but not be limited to, the operation, calibration and
testing of the Remote Terminal Unit ("RTU"), transducers, chart
recorders, meter runs, gas quality monitoring devices, control
valves and responsibility for quantity calculations for the
measurement facility. Pipeline may allow Shipper or third parties
the right to perform measurement operations, provided, however, such
Shipper or third party shall furnish to Pipeline all data required
for flow computation and meet Pipeline's measurement and operating
standards; and provided, further, such Shipper or third party which
performs such measurement operations shall be responsible for any
and all associated costs of such measurement operations unless
otherwise agreed by Pipeline and Shipper or third party.
Measurement equipment shall consist of the necessary metering
devices, designed and installed in accordance with the current
published recommendations of the American Gas Association or as
mutually agreed upon by Shipper and Pipeline. Measurement equipment
shall be installed, operated and maintained at or on each
interconnection of Pipeline's facility with facilities of third
parties; provided, however, Pipeline shall have the right to require
and may install or cause to be installed electronic gas measurement
and control equipment at all points.
(a) Where orifice measurement equipment is to be used, it
shall utilize "Flange Tap Connections" and the static
pressure shall be measured at the downstream flange tap
connection.
(b) An electronic temperature transducer, a recording
thermometer or other mutually acceptable device shall be
installed at the measuring station to measure the
flowing gas temperature.