Cameron Interstate Pipeline, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2008, Docket: RP08-647-000, Status: Effective
Original Sheet No. 132 Original Sheet No. 132
GENERAL TERMS AND CONDITIONS
(continued)
14.2 Notwithstanding any of the requirements in this Section 14, Pipeline
shall have no obligation to accept gas from Shipper if that gas does
not meet the most stringent requirements of any downstream
interconnected pipeline.
14.3 Natural or Artificial Gas. The gas received or delivered by
Pipeline hereunder shall be a combustible gas consisting wholly of,
or a mixture of:
(a) Natural gas of the quality and composition produced in
its natural state except that the Pipeline may extract or
permit the extraction of any of the constituents thereof
except methane, as set forth in detail in GT&Cs Section
14.5.
(b) Gas generated by vaporization of Liquefied Natural Gas
("LNG").
(c) Manufactured, reformed, or mixed gas consisting
essentially of hydrocarbons of the quality and character
produced by nature in the petroleum, oil and gas fields
with physical properties such that when the artificial
pipeline gas is commingled with natural gas, the
resulting mixture is indistinguishable from natural gas
complying with specifications under this Tariff.
14.4 Total Heating Value.
(a) No gas tendered hereunder shall have a Total Heating
Value at the Receipt Point below 980 Btu per cubic foot
("BTU/CF") and no more than 1100 BTU/CF.
(b) The total heating value shall be determined by gas
chromatographic analysis using the most recent AGA
standards or any revision thereof, accepted industry
standards, or other methods mutually agreed upon by
Shipper and Pipeline.