Cameron Interstate Pipeline, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2008, Docket: RP08-647-000, Status: Effective
Original Sheet No. 100 Original Sheet No. 100
GENERAL TERMS AND CONDITIONS
(continued)
10.5 Notice of Curtailment.
(a) Notice by Pipeline. Pipeline shall provide Shipper with
notice of curtailment at a time and in a manner that is
reasonable under then existing conditions and shall
confirm in writing pursuant to GT&Cs Section 29.
(b) Notice by Shipper. Shipper shall have the
responsibility to inform its customers, suppliers, other
Pipelines and all others involved in the transaction, as
to any curtailment or interruption.
(c) Notice of a Shipper Emergency Situation. Pipeline shall
provide notice to any Shipper that is curtailed to a
lower quantity as a result of a request submitted under
the Shipper Emergency Situation relief provisions of
GT&Cs Section 10.6. Such notice shall be provided in a
time and manner that is reasonable under then existing
conditions, but no later than two (2) hours of such
curtailment. In the event Shipper requesting Shipper
Emergency Situation relief provides the sworn statement
required by GT&Cs Section 10.6, Pipeline shall provide a
copy of the sworn statement at the request of any
Shipper curtailed to a lower quantity or service is
discontinued as a result of the anticipated sworn
statement.
10.6 Shipper Emergency Situation. In the event Pipeline is advised by a
Shipper that, absent adjustment of the curtailment level
contemplated by GT&CS Sections 10.2 and 10.3, the Shipper will be
unable for the duration indicated by Shipper to avoid irreparable
injury to life or property or to provide for minimum plant
protection ("Shipper Emergency Situation"), then Pipeline may adjust
its curtailment of all other Shippers on a pro rata basis as
necessary to deliver the quantities required to avoid or mitigate
the threatened or existing Shipper Emergency Situation. While
Pipeline may make adjustments in curtailment promptly upon
notification by Shipper, Shipper must provide Pipeline within
twenty-four (24) hours of notification a sworn statement including:
(a) a detailed explanation of and an estimated duration for
the Emergency Situation;