Cameron Interstate Pipeline, LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 11/01/2008, Docket: RP08-647-000, Status: Effective

Original Sheet No. 100 Original Sheet No. 100

 

GENERAL TERMS AND CONDITIONS

(continued)

 

 

10.5 Notice of Curtailment.

 

(a) Notice by Pipeline. Pipeline shall provide Shipper with

notice of curtailment at a time and in a manner that is

reasonable under then existing conditions and shall

confirm in writing pursuant to GT&Cs Section 29.

 

(b) Notice by Shipper. Shipper shall have the

responsibility to inform its customers, suppliers, other

Pipelines and all others involved in the transaction, as

to any curtailment or interruption.

 

(c) Notice of a Shipper Emergency Situation. Pipeline shall

provide notice to any Shipper that is curtailed to a

lower quantity as a result of a request submitted under

the Shipper Emergency Situation relief provisions of

GT&Cs Section 10.6. Such notice shall be provided in a

time and manner that is reasonable under then existing

conditions, but no later than two (2) hours of such

curtailment. In the event Shipper requesting Shipper

Emergency Situation relief provides the sworn statement

required by GT&Cs Section 10.6, Pipeline shall provide a

copy of the sworn statement at the request of any

Shipper curtailed to a lower quantity or service is

discontinued as a result of the anticipated sworn

statement.

 

 

10.6 Shipper Emergency Situation. In the event Pipeline is advised by a

Shipper that, absent adjustment of the curtailment level

contemplated by GT&CS Sections 10.2 and 10.3, the Shipper will be

unable for the duration indicated by Shipper to avoid irreparable

injury to life or property or to provide for minimum plant

protection ("Shipper Emergency Situation"), then Pipeline may adjust

its curtailment of all other Shippers on a pro rata basis as

necessary to deliver the quantities required to avoid or mitigate

the threatened or existing Shipper Emergency Situation. While

Pipeline may make adjustments in curtailment promptly upon

notification by Shipper, Shipper must provide Pipeline within

twenty-four (24) hours of notification a sworn statement including:

 

(a) a detailed explanation of and an estimated duration for

the Emergency Situation;