Cameron Interstate Pipeline, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2008, Docket: RP08-647-000, Status: Effective
Original Sheet No. 91 Original Sheet No. 91
GENERAL TERMS AND CONDITIONS
(continued)
(c) More than One Shipper. If the quantity of gas delivered
at a single Delivery Point is applicable to gas
delivered by Pipeline to more than one Shipper, then the
total measured quantity shall be allocated in accordance
with the PDA methodology chosen by the Delivery Point
operator in accordance with GT&Cs Section 7.3.
(d) Delivery Point Authorized Daily Overrun. Shipper may
submit to Pipeline a request for an authorized waiver of
Shipper's MDDQ or segment entitlement on the Gas Day
prior to scheduled flow or on the Gas Day of scheduled
flow. Pipeline may transport for Shipper the requested
deliveries in excess of Shipper's MDDQ or segment
entitlement to the extent physical operating conditions
permit and to the extent Pipeline is able reasonably to
determine that such deliveries will not impair
Pipeline's ability to provide firm service to other
Shippers on Pipeline's system. In such circumstances,
the delivery of gas in excess of Shipper's MDDQ or
segment entitlement will be firm, provided that the
total scheduled deliveries for such Shipper at all of
its Delivery Points do not exceed Shipper's MDTQ.