Riverside Pipeline Company, L. P.
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/1993, Docket: RS92- 48-001, Status: Effective
Original Sheet No. 119 Original Sheet No. 119 : Effective
GENERAL TERMS AND CONDITIONS
25. ANNUAL CHARGE ADJUSTMENT
25.1 Purpose
For the purpose of funding of the Federal Energy Regulatory
Commission's costs incurred in any fiscal year, this Section 25
establishes an annual charge adjustment to be applicable to
Riverside's Rate Schedules as set forth on Sheet No. 7 of this
FERC Gas Tariff.
25.2 Basis of the Annual Charge Adjustment
The Rate Schedules specified on Sheet No. 7 hereof shall include
an increment for an Annual Charge Adjustment for Federal Energy
Regulatory Commission costs. Such adjustment shall be the charge
factor, adjusted to Riverside's temperature base, pressure base,
and heating value, if required, which is stated in the Federal
Energy Regulatory Commission's Annual Charge Billing. The Annual
Charge Adjustment shall be reflected on Sheet No. 7 of this Volume
No. 1 Tariff.
25.3 Filing Procedure
The initial Annual Charge Adjustment or any subsequent changes in
such assessment charge shall be filed by Riverside at least thirty
(30) days prior to the proposed effective date.
The proposed effective date of filings shall be October 1 of each
calendar year. Any such filing shall not become effective unless
it becomes effective without suspension or refund obligation.
25.4 Remittance to the Federal Energy Regulatory Commission
Riverside shall remit to the Federal Energy Regulatory Commission,
not later than forty-five (45) days after receipt of the Annual
Charge Billing, the Total Annual Charge stated on such billing.