Riverside Pipeline Company, L. P.
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/1993, Docket: RS92- 48-001, Status: Effective
Original Sheet No. 103 Original Sheet No. 103 : Effective
GENERAL TERMS AND CONDITIONS
17. OPERATIONAL FLOW ORDERS
17.1 General
(a) Subject to the provisions of this Section 17, Riverside may
issue Operational Flow Orders ("OFOs") to any Shipper
provided the operational integrity of its system is
threatened. If Shipper does not comply with the OFOs issued
hereunder, in addition to all other remedies, Shipper shall
be liable for any resulting damages, costs, or expenses
incurred by Riverside or any other Shipper, provided
however, that no Shipper that is subject to an OFO shall be
required to exceed its contractual maximums, minimums, or
other contractual authorizations. OFOs will be issued by
2:00 p.m. Central time to be effective at the beginning of
the first gas day following issuance, unless otherwise
provided in the OFO. Each Shipper affected by an OFO shall
be permitted to make scheduling changes for four (4) hours
after issuance of the OFO. Compliance with an Operational
Flow Order shall excuse Shipper from any otherwise
applicable penalties under Section 15.2 of these General
Terms and Conditions.
(b) Each Shipper shall designate one or more persons for
Riverside to contact on operational matters on a 24-hour a
day, 365 days a year basis. If Riverside is unable to
contact any Shipper because that Shipper's contact person(s)
is unavailable, such Shipper shall be solely responsible for
any consequences arising from such failure of
communications.
(c) Operational Flow Orders shall be issued by telephone and
facsimile transmission and shall also be posted on
Riverside's EBB. Notice of such OFO shall specify the
nature of the problem sought to be addressed, the
anticipated duration of the required compliance, and the
parameters of such compliance.