Riverside Pipeline Company, L. P.

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 10/01/1993, Docket: RS92- 48-001, Status: Effective

Original Sheet No. 103 Original Sheet No. 103 : Effective

 

 

GENERAL TERMS AND CONDITIONS

 

 

17. OPERATIONAL FLOW ORDERS

 

17.1 General

 

(a) Subject to the provisions of this Section 17, Riverside may

issue Operational Flow Orders ("OFOs") to any Shipper

provided the operational integrity of its system is

threatened. If Shipper does not comply with the OFOs issued

hereunder, in addition to all other remedies, Shipper shall

be liable for any resulting damages, costs, or expenses

incurred by Riverside or any other Shipper, provided

however, that no Shipper that is subject to an OFO shall be

required to exceed its contractual maximums, minimums, or

other contractual authorizations. OFOs will be issued by

2:00 p.m. Central time to be effective at the beginning of

the first gas day following issuance, unless otherwise

provided in the OFO. Each Shipper affected by an OFO shall

be permitted to make scheduling changes for four (4) hours

after issuance of the OFO. Compliance with an Operational

Flow Order shall excuse Shipper from any otherwise

applicable penalties under Section 15.2 of these General

Terms and Conditions.

 

(b) Each Shipper shall designate one or more persons for

Riverside to contact on operational matters on a 24-hour a

day, 365 days a year basis. If Riverside is unable to

contact any Shipper because that Shipper's contact person(s)

is unavailable, such Shipper shall be solely responsible for

any consequences arising from such failure of

communications.

 

(c) Operational Flow Orders shall be issued by telephone and

facsimile transmission and shall also be posted on

Riverside's EBB. Notice of such OFO shall specify the

nature of the problem sought to be addressed, the

anticipated duration of the required compliance, and the

parameters of such compliance.