Ngo Transmission, Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/22/2003, Docket: RP04- 67-001, Status: Effective
First Revised Sheet No. 98 First Revised Sheet No. 98 : Effective
Superseding: Original Sheet No. 98
Evening Nomination Cycle; 7 A.M. CCT for the Intraday 1
Nomination Cycle; and 2:30 P.M. CCT for the Intraday 2
Nomination Cycle. Notification to all affected Replacement
Shippers provided by Transporter within one hour of receipt
of recall notification. Such notification will confirm that
the conditions of recall have been met and will be
accompanied by the scheduling information required by
Section 9.
(ii) When Transporter sends Internet E-mail notification for
recalling of capacity to each affected Replacement Shipper,
the subject line of the E-mail will include the following
information separated by commas in the following order: (1)
"Recall", (2) the recall notification period, (3) the
Effective Date in YYYYMMDD format, and (4) the name or
abbreviation of Transporter (excluding commas). The body of
such E-mail notification will contain at least the affected
Replacement Shipper's Contract Number, the quantity of
capacity being recalled, and the Offer Number or Award
Number, if necessary to uniquely identify the capacity being
recalled. Where supported by Transporter, for recalls that
are effective at non-standard times, the appropriate recall
notification period will be included in the subject line and
the effective time of the recall will be in the body of the
E-mail. Recall notifications by Transporter by other
mechanisms in addition to Internet E-mail will include at
least the same level of information.
(iii) Replacement Shipper shall provide Transporter with no more
than two (2) Internet E-mail Addresses to be used for recall
notification. The obligation of Transporter to provide
notification is waived until at least one (1) of the
addresses has been provided.
(iv) The recall notification provided to Transporter shall
express the quantity to be recalled in terms of adjusted
total released capacity entitlements based upon the Elapsed
Prorata Capacity (EPC). In the event of an intraday capacity
recall, Transporter will determine the allocation of