Ngo Transmission, Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/22/2003, Docket: RP04- 67-000, Status: Effective
Original Sheet No. 24 Original Sheet No. 24 : Effective
5.4 Retainage: For all injections, Transporter shall deduct from the
volume tendered to Transporter by Shipper an amount of gas
sufficient to compensate Transporter for compressor station fuel,
line loss and/or other utility purposes, plus other unaccounted
for gas used in the operation of Transporter's pipeline system in
connection with such transportation. The applicable retain age
percentage shall be stated in the effective Notice of Rates in
this Tariff.
5.5 Overrun Service Charge: If Shipper, upon receiving the advance
approval of Transporter, should on any day inject or withdrawal a
quantity of natural gas in excess of the MDIQ or MDWQ specified in
Shipper's FSS Agreement, then such quantity shall constitute an
authorized overrun quantity. For all such authorized overrun
volumes, Shipper shall pay Transporter a rate up to the overrun
service charge stated in the effective Notice of Rates in this
Tariff.
5.6 Right to File Rate Changes: Transporter shall have the unilateral
right to file with the appropriate regulatory agency and make
changes effective in the rates and charges or the terms and
conditions of this Rate Schedule or the applicable General Terms
and Conditions. Shipper may protest or contest any such filing.
6. GENERAL TERMS AND CONDITIONS
6.1 The General Terms and Conditions of this Tariff are incorporated
by reference into this Rate Schedule.
6.2 In the event of a conflict between the provisions of this Rate
Schedule and the General Terms and Conditions of this Tariff, the
provisions of the General Terms and Conditions shall govern.